Project: phowe   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Philip Howe   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:1711.75
Total Flight Time:6
Total Expense:N/A
Start/Last Date:Oct 19, 2020 - No Finish Date
Engine:Rotax 915is
Propeller:Whirlwind
Panel:Dynon
 
Friendly URL: https://eaabuilderslog.org?s=phowe

Home or Last Project Picture

Aug 09, 2021     Fabricating window supports between tailcone and cage - (8 hours)       Category: Fuselage
Took us a while to find the material from which to fabricate the window supports, to discover that we didn't have enough. Luckily Synergy had a spare angle bar with the same dimensions, and bonus it was already primed. So we cut the required lengths and created the angled tang. We now need to finish the "fitting" to the top of the cage. We are grinding material off of the sides and top to fit around the welds.


 